Egress Window Installation Process: What to Expect in Minneapolis-Saint Paul
A complete step-by-step walkthrough of professional egress window installation, including timeline expectations, preparation requirements, and what Twin Cities homeowners experience during the 2-3 day installation process.

Installation Timeline Overview
Professional egress window installation typically takes 2-3 days for most Minneapolis-Saint Paul homes. The process involves excavation, foundation work, window installation, and finishing - all coordinated to minimize disruption to your daily routine.
Phase 1: Pre-Installation Planning (1-2 Weeks)
The installation process actually begins well before any digging starts. This critical planning phase ensures your egress window installation proceeds smoothly and meets all Minneapolis-Saint Paul area building codes.
Initial Consultation and Assessment
Your contractor will conduct a comprehensive on-site evaluation to determine:
- Basement layout and structural considerations - identifying support beams, utilities, and optimal window placement
- Existing foundation type - concrete block, poured concrete, or stone foundations require different approaches
- Exterior conditions - landscaping, utility lines, property lines, and drainage considerations
- Interior finishing requirements - existing wall coverings, electrical work, and desired aesthetic outcomes
- Code compliance needs - ensuring installation meets Minnesota IRC R310 requirements
Permit Application Process
Most Minneapolis-Saint Paul area municipalities require building permits for egress window installation. Professional contractors typically handle this process, which includes:
- Permit application submission with detailed plans and specifications
- Site plan preparation showing property boundaries and setback compliance
- Structural drawings detailing foundation modifications and window placement
- Product specifications for windows, window wells, and materials
- Fee payment based on project valuation (typically $150-$400 depending on city)
Permit Timeline Considerations
Permit approval can take 1-3 weeks depending on the municipality and season. Minneapolis and Saint Paul typically have faster processing, while some suburban communities may require additional review time. Plan accordingly for spring and summer peak seasons.
Utility Locates and Site Preparation
Before any excavation begins, contractors must contact Gopher State One Call(dial 811) to mark underground utilities. This free service locates:
- Electric lines
- Gas pipes
- Water and sewer lines
- Telecommunications cables
- Cable TV lines
Timeline: Allow 2-3 business days for utility marking completion.
Day 1: Excavation and Site Preparation
What Happens on Installation Day 1
- Site setup and safety preparation
- Exterior excavation and earth removal
- Window well area preparation
- Foundation marking and measurement
- Initial site cleanup
Morning: Site Setup and Safety
Professional installation teams arrive early (typically 7:00-8:00 AM) with all necessary equipment:
- Excavation equipment - compact excavators or manual digging tools depending on site access
- Safety equipment - proper shoring materials for excavation safety
- Protective materials - tarps and barriers to protect landscaping and home exterior
- Disposal containers - for soil and debris removal
Excavation Process
Excavation typically begins on the exterior of your home, working down to the foundation level where the egress window will be installed. The process involves:
- Soil removal: Careful excavation to create adequate working space
- Foundation exposure: Cleaning foundation walls and inspecting for any issues
- Depth measurement: Ensuring proper depth for code-compliant window well
- Utility avoidance: Working around any utilities identified during the locate process
What to Expect as a Homeowner
Noise levels: Excavation involves substantial noise, particularly if mechanical equipment is used. Most work occurs during normal business hours (8:00 AM - 5:00 PM).
Access needs: Crews need clear access to the installation area. Remove any decorative plantings, furniture, or obstacles from the work zone.
Basement accessibility: You can typically continue using your basement, though the installation area should be cleared of personal items.

Day 2: Foundation Work and Window Installation
Day two involves the most technical aspects of egress window installation, including precision foundation cutting and window placement.
Foundation Cutting and Opening Creation
Creating the window opening requires specialized equipment and expertise:
- Diamond blade cutting: Precise cuts through concrete or block foundations
- Dust control measures: Professional equipment to minimize dust in your home
- Structural reinforcement: Adding headers or supports as needed
- Opening refinement: Ensuring smooth, square openings for proper window fit
Window Installation Process
Once the foundation opening is complete, window installation proceeds:
- Window placement: Careful positioning to ensure proper fit and operation
- Level and square adjustment: Critical for proper window function and sealing
- Anchoring: Secure attachment to foundation using appropriate fasteners
- Sealing and weatherproofing: Complete perimeter sealing against water infiltration
Window Well Construction
Window well installation occurs simultaneously with window placement:
- Well placement: Positioning corrugated metal, composite, or masonry wells
- Anchoring system: Securing wells to foundation walls
- Gravel base: Installing drainage gravel in well bottom
- Drainage connection: Connecting to foundation drainage system if required
Day 3: Finishing and Final Details
Final Day Focus
The final day emphasizes quality finishing, safety testing, and site restoration. Your contractor ensures every detail meets code requirements and aesthetic expectations.
Interior Finishing Work
Interior finishing varies based on your existing basement and desired outcome:
- Drywall installation: Finishing wall surfaces around the new window
- Insulation: Adding proper insulation around the window frame
- Trim installation: Interior trim and casing for finished appearance
- Paint or stain: Final finish to match existing décor
Exterior Completion
Exterior work focuses on weatherproofing and aesthetic integration:
- Siding or brick work: Matching existing exterior materials
- Caulking and sealing: Complete weather sealing around window frame
- Window well finishing: Adding covers, grates, or decorative elements
- Backfill and grading: Proper soil placement and drainage grading
Quality Control and Testing
Before completion, professional installers perform comprehensive testing:
- Window operation: Verifying smooth opening and closing
- Water testing: Checking for any leaks or infiltration
- Measurement verification: Confirming code compliance for opening dimensions
- Safety check: Ensuring easy emergency egress operation
Special Considerations for Minneapolis-Saint Paul
Winter Installation Challenges
Minnesota's harsh winters present unique challenges for egress window installation:
- Frozen ground: May require specialized excavation equipment
- Weather delays: Extreme cold or snow can postpone outdoor work
- Concrete curing: Cold weather affects concrete and mortar curing times
- Material handling: Some materials require temperature-controlled storage
Professional recommendation: While winter installation is possible, spring and fall typically provide optimal conditions for egress window projects.
Existing Basement Finishing Complications
Finished basements require additional considerations:
- Electrical work: Moving outlets, switches, or fixtures
- Plumbing modifications: Rerouting pipes that interfere with window placement
- HVAC adjustments: Modifying ductwork or registers
- Flooring protection: Covering and protecting existing floor finishes
Multiple Window Projects
Installing multiple egress windows can be more efficient but requires careful coordination:
- Extended timeline: Additional 1-2 days per window
- Staging considerations: Managing equipment and materials
- Permit requirements: May require separate permits for each window
- Cost efficiencies: Shared mobilization and setup costs
What Homeowners Should Do Before, During, and After
Before Installation Begins
- Clear the area: Remove furniture, decorations, and personal items from installation zone
- Protect valuables: Cover or move items sensitive to dust and vibration
- Arrange temporary accommodations: Plan for noise disruption during work hours
- Notify neighbors: Inform adjacent property owners about temporary construction activity
- Verify insurance: Confirm your homeowner's insurance covers construction work
During Installation
- Maintain clear access: Keep pathways to work areas unobstructed
- Communicate concerns: Address any questions or issues with the project manager
- Document progress: Take photos for your records and insurance purposes
- Supervise pets: Keep animals away from work areas for their safety
- Plan alternative access: Work areas may be temporarily inaccessible
After Installation Completion
- Final walkthrough: Review completed work with your contractor
- Test window operation: Verify smooth opening and closing
- Understand maintenance: Learn proper care for your new egress window
- Schedule final inspection: Arrange municipal inspection if required
- Document completion: Obtain warranties, permits, and completion certificates
Project Timeline Summary
Conclusion: Professional Installation for Peace of Mind
Professional egress window installation in Minneapolis-Saint Paul involves careful planning, skilled execution, and attention to detail that ensures both code compliance and long-term performance. While the process typically takes 2-3 days of active work, the planning and permit phases are equally important for successful outcomes.
Working with experienced contractors ensures your installation proceeds smoothly, meets all local building codes, and provides your family with reliable emergency egress for years to come. The investment in professional installation pays dividends in safety, home value, and peace of mind.